Refurbishment of Intake Screen at a WPS

Principal:

SEQ Water

Location:

Mount Crosby East Bank Water Pumping Station

Project Overview


The refurbishment of these 2 intake screens will allow the plant to continue to meet the required performance to provide a reliable and long-term system for effectively collecting debris in the raw water intake tunnels.

Image
Image
Corrosive Controls - Refurbishment of an Intake Screen by Neumann Water
Image
Image
Image
Neumann Water - Full Service Capability - Refurbishment of Intake Screen
Image
Image
Image
Image
Image
Image
Image
Image

Water Pumping Station – Refurbishment of Intake Screens

Overview of Project:

Refurbish Intake Screen — the intake screens ensure no debris that could damage the pump stations passes through, and are essential for required flow. There are three screens: two are in use and one is a spare. Two of the screens are not fit for purpose.

The refurbishment of these two intake screens will allow the plant to continue to meet the required performance to provide a reliable and long-term system for effectively collecting debris in the raw water intake tunnels.

Scope of Works:

The screens were repaired by:

  • Undertaking a condition assessment;
  • replacing the galvanised mesh, nuts and bolts as per the scope of works;
  • the free issue anodes and hardwood were pre-fitted and removed prior to blasting and painting;
  • the repaired screens were then blasted and painted as per WSA 201.t;
  • the screens were fully assembled in the Neumann Water workshop and returned to site for the Principal to reinstall.

This process was then repeated for the second screen.

Conclusion/Outcome:

With the help of Neumann Contractors for blasting and painting, the project was delivered on time and on budget, and potentially will be carried out by Neumann Water every two years.