ASSET UPGRADES
& LIFECYCLE


Maximise performance and extend asset life through planned upgrades and strategic lifecycle management.

OPTIMISING YOUR WATER TREATMENT ASSETS FOR LONG-TERM PERFORMANCE


Neumann Water delivers asset upgrade and lifecycle management services that improve capacity, enhance efficiency and extend the operational life of water treatment facilities. Our team works with plant operators to assess equipment condition, identify upgrade opportunities and implement practical solutions that align with your operational strategy and budget.

As water treatment equipment ages, obsolescence becomes a significant risk. Components become unavailable, maintenance costs increase, and reliability declines. Our asset upgrade service addresses these challenges through systematic assessment, engineering solutions and proven upgrade strategies that enhance performance while maintaining operational continuity.

We take a whole-of-life approach to asset management, developing planned maintenance programs and upgrade schedules that maximise asset value while minimising total cost of ownership. Our work is supported by comprehensive engineering resources, in-house fabrication capabilities and access to specialist services across the Neumann Group.

OUR ASSET UPGRADE CAPABILITIES




CAPACITY & EFFICIENCY UPGRADES


Increase throughput and improve operational efficiency through targeted equipment upgrades. We deliver pump capacity improvements through impeller upgrades, motor replacements and control optimisation, skid upgrades for improved flow rates, pipework modifications to reduce pressure losses, and drive system upgrades including VSD installations for energy efficiency. Our upgrade projects integrate seamlessly with existing infrastructure while delivering measurable performance improvements.

Key Benefits:


  • Image
    Pump and drive capacity improvements
  • Image
    Energy efficiency upgrades
  • Image
    Process efficiency enhancements
  • Image
    Measurable performance outcomes




OBSOLESCENCE REMEDIATION & REPLACEMENTS


Address obsolete equipment before it becomes a critical failure risk. Our obsolescence management service includes comprehensive equipment audits and risk assessments, like-for-like replacements where appropriate, fit-for-purpose upgrades using modern equivalents with improved reliability, and reverse engineering with custom fabrication where components are no longer available. We provide staged replacement programs to manage budget and operational constraints.

Key Benefits:


  • Image
    Proactive obsolescence management
  • Image
    Like-for-like and improved replacements
  • Image
    Custom fabrication for unavailable components
  • Image
    Reduced risk of critical failures





MEMBRANE TRAIN & EQUIPMENT REFURBISHMENTS


Extend the life and improve performance of reverse osmosis and membrane filtration systems through complete train refurbishment including pressure vessel restoration, pipework and valve replacement, and instrumentation upgrades. We design and fabricate custom handling equipment including dedicated lifting jigs for membrane elements, pump removal equipment and valve handling systems that eliminate manual handling risks and reduce maintenance duration.

Key Benefits:


  • Image
    Complete membrane train refurbishment
  • Image
    Pressure vessel restoration and testing
  • Image
    Custom handling equipment design
  • Image
    Eliminates manual handling risks




PLANNED MAINTENANCE & SYSTEM INTEGRATION


Develop maintenance programs aligned to your plant strategy including asset condition assessments, scheduled overhauls, predictive maintenance using condition monitoring, and comprehensive documentation. We collaborate with your functional design and controls partners to align mechanical upgrades with control system improvements, including instrumentation upgrades, PLC and SCADA integration, and remote monitoring capabilities for seamless commissioning.

Key Benefits:


  • Image
    Tailored maintenance strategies
  • Image
    Condition-based maintenance approach
  • Image
    Coordinated mechanical and control upgrades
  • Image
    Enhanced operational visibility


OUR UPGRADE WORK IN ACTION








Frequently Asked Questions


We conduct comprehensive condition assessments considering equipment age, maintenance history, parts availability, failure frequency, operational performance and energy efficiency. We provide recommendations with cost-benefit analysis for repair, upgrade or replacement options, enabling informed decision-making aligned to your budget and operational priorities.

FEATURED ASSET UPGRADE PROJECTS


Winch and Trash Screens Installation at Dam

Wappa Dam New Winch and Trash Screens Installation at Dam Overview of Project: The Dam was a mass concrete gravity arch dam with earth fill abutments and an ungated spillway across the River that is located in the south east region of Queensland, Australia. Scope of Works: Supply, installation and commissioning of an electric chain hoist and all lifting accessories

Winch and Trash Screens Installation at Dam

VIEW PROJECT

Refurbishment of Intake Screen at a WPS

Water Pumping Station – Refurbishment of Intake Screens Overview of Project: Refurbish Intake Screen — the intake screens ensure no debris that could damage the pump stations passes through, and are essential for required flow. There are three screens: two are in use and one is a spare. Two of the screens are not fit for purpose. The refurbishment of

Refurbishment of Intake Screen at a WPS

VIEW PROJECT

Temporary Storage Water Tanks at a WTP

Supply and Install Three Temporary Storage Tanks Overview of Project: Supply and install temporary water storage tanks. Scope of Works: Neumann Water supplied and installed 3 x water tanks for temporary storage while work was carried out on the roof of the main storage reservoir. This included new pipework, valves, and water sampling points. Innovations: Innovation was to install a

Temporary Storage Water Tanks at a WTP

VIEW PROJECT

Water Reservoirs Roof Gutters and Stormwater

Water Reservoir Maintenance – Roof Stormwater and Gutter Works Overview of Project: The scope of this project is to design and construct roof gutters and stormwater systems for two water reservoirs and flooring replacement at an adjacent water pump station. Scope of Works: Gutter System The eaves gutter system will be designed in accordance with AS/NZS 3500.3 Plumbing and Drainage

Water Reservoirs Roof Gutters and Stormwater

VIEW PROJECT

Gravity Thickener Refurbishment at WWTP

Gravity Thickener Refurbishment Overview of Project: Neumann Water was contracted to dismantle and refurbish a gravity thickener at a wastewater treatment plant. Scope of Works: The works included: Fully dismantle and remove gravity thickener; Sandblast and paint all components; Reinstall all components; Realign the rake and drive; Mechanical service of the drive gearbox. Challenges: Some challenges included: Confined space entry;

Gravity Thickener Refurbishment at WWTP

VIEW PROJECT

New Transfer Pump Bypass at Bundamba WPS

Bundamba West Pumping Station – New Transfer Pump Bypass Overview of Project: Currently, temporary mapress 316 SS bypass pipework within the Bundamba West pump station is used to supply water from the Eastern Pipeline to the Bundamba Treated Water tanks. It was identified that fit-for-purpose designed pipework was required to replace the temporary solution for ongoing supply. The pipework changes

New Transfer Pump Bypass at Bundamba WPS

VIEW PROJECT

DISCUSS YOUR ASSET UPGRADE REQUIREMENTS


Whether you need capacity improvements, obsolescence management, or a comprehensive asset lifecycle strategy, our upgrade team is ready to help. Contact Neumann Water today.